Lapointe Architects

Monday, November 7, 2011

River House construction begins





Mike Holmes and The Holmes Group have started the construction of River House and have installed silt fencing. Tree hoarding and the pool has been covered. The deep foundations designed to resist future shore erosion are in the ground. The detached garage and the house are being built at the same time.

Labels: ,


Comments: Post a Comment

Subscribe to Post Comments [Atom]





<< Home

This page is powered by Blogger. Isn't yours?

Subscribe to Posts [Atom]